Restoring an old front in Dover means keeping the character and solving the modern problems. Door gear, lighting, security and cleaning all have to work without showing from the street.
Bring whatever you have to the survey in Dover: brand guidelines, lease plans, old drawings or a photo of a frontage you admire.

How would we approach heritage shopfronts for your Dover premises?
In a parade of matching period fronts in Dover, your neighbours are the pattern book. If their pilasters or cornices survive, we'd copy those sizes so your unit rejoins the row.
Deep recessed lobbies are among the first things to go in a refit. If your Dover premises still have one, especially with a tiled floor, we'd protect it, repair the floor and reuse the returns as display.
If there are storeys above the shop, the frontage should feel like the base of the building and not a sign stuck on it. Lining up mullions with the windows overhead is a small move that settles the whole elevation at Dover premises.
What should you budget for heritage shopfronts in Dover?
Until the survey is done, plan on £8,495 to £24,995 plus VAT for a typical frontage. Unusual sizes, fine detail and phased working push the figure up, while a simple brief and clear access keep it toward the lower end.
What consents could affect heritage shopfronts in Dover?
For heritage shopfronts at premises in the Dover area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.
Dover applications for planning permission or advertisement consent are normally handled by Dover District Council. Our survey includes a check of the position for your address.
| Town | Dover |
|---|---|
| Area | Kent |
| Postcode districts | CT14, CT16, CT17 |
| Planning authority | Dover District Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 169 miles |
| Survey | Free for new work |
Questions about heritage shopfronts in Dover
How long will restoration take at my Dover premises?
New joinery typically takes 8 to 14 weeks to make, then 1 to 3 weeks on site. The survey gives you a realistic programme, because repair-only jobs can take far less.
Can you find the colour my Dover shopfront used to be?
Often. Scraping back through the paint layers shows earlier colours, and a specialist can analyse them if the detail matters.
Can a new sign go on my old Dover shopfront?
Yes, and traditional sign writing often looks right on a painted fascia. We'd draw the lettering to suit the fascia, then fix anything raised so it does no harm to the original timber.
Does a new shopfront in the Dover area need Building Regulations approval?
Assume yes until building control says otherwise. England has no like-for-like exemption, though registered installers can self-certify replacement windows and doors in non-dwellings. That route doesn't cover structural glass, curtain walling or revolving doors.
Does a shop sign in the Dover area need advertisement consent?
Not always. In England, an unlit sign within Class 5 of the 2007 Advertisement Regulations generally needs no application, and neither does a lit sign within Class 4B. Anything outside those classes needs consent, and Class 4B isn't available in conservation areas, so check before ordering.