0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Planning and consents
  4. Cornwall

Planning and consents in Cornwall

A written, itemised price for planning and consent support in Cornwall, valid for 90 days.

Our fee for planning and consent support in Cornwall is written and itemised before any work starts, which gives you time to take it to a landlord, a partner or a board.

Your frontage is read alongside its neighbours, so we note the fascia line, stallriser height and pilasters on either side before drawing planning and consent support for Cornwall premises. Matching those lines or breaking them on purpose can both work, whereas doing it by accident never does.

Shopfront planning drawings showing elevation, section and location plan spread on a desk

How do we handle planning and consent support for premises in Cornwall?

One set of drawings should answer every question. For a frontage near Truro we put signs, lighting, shutters and canopies on the same elevations, so nothing surfaces later as a surprise.

Older buildings need more evidence. If your premises in Cornwall have surviving features, we photograph and draw them before the design is fixed, so the submission shows what will be kept.

What consents apply to shopfront work in Cornwall?

Security grilles and shutters are named in England's rules: installing or replacing one on a shopfront sits outside the shop permitted development rights. The frontage itself is treated the same way, so for shopfront work at premises in the Cornwall area, building work that materially affects the appearance needs planning permission. Confirm the position with the council before anything is ordered.

How much does planning and consent support cost in Cornwall?

Until the survey is done, plan on £395 to £1,295 plus VAT per application, plus the council's fee. Unusual sizes, fine detail and phased working push the figure up, while a simple brief and clear access keep it toward the lower end.

Cornwall at a glance
AreaCornwall
NationEngland
Towns covered12
Main townTruro
Planning regimeEngland: TCPA 1990 and the 2007 Advertisement Regulations
Building approvalBuilding Regulations (Approved Documents)
SurveyFree for new work, from our Great Barr base

Questions about planning and consent support in Cornwall

Can the sign and shopfront be drawn together for premises in Cornwall?

Yes, and that is how we prefer to work. One drawing set shows the frontage as it will really look, which helps everyone reviewing it.

Do you prepare applications for premises across Cornwall?

Yes. We measure, draw and prepare the application, then submit it and answer the officer's questions. The decision itself is never ours to make, and we will always be plain about that.

Can you take over an application already started for premises around Truro?

Often, yes. Send us the drawings and any correspondence, and we will check them against a measured survey. If the officer has raised points, we would deal with those first.

Do I need listed building consent for a shopfront in the Cornwall area?

Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.

Do roller shutters need planning permission in the Cornwall area?

Usually yes. Installing or replacing a security grill or shutter on a shopfront is expressly outside England's shop permitted development rights, so the only way to avoid an application is work that doesn't materially affect the appearance. Ask the council before ordering.

Need planning and consent support in Cornwall?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price