Timber gives a shopfront in Bognor Regis something metal can't: real depth, cast shadows and mouldings you can run your hand along. We draw each front to the measured opening and make it to those signed-off dimensions.
Please have keys to any meter cupboards and shutter housings to hand when we survey in Bognor Regis, because what sits behind them can change the drawing.

How would we approach timber shopfronts for your Bognor Regis premises?
A brand rollout can include timber, as long as the details repeat. For a branch in Bognor Regis we'd use the same mouldings, colours and sign panel as your other sites, adjusting only the widths and heights to fit the opening.
Timber fits a night programme better than you'd think, since most of the joinery is made elsewhere. For a unit in Bognor Regis that can't close by day, we'd fit the frame in stages at night and leave painting until the end, once the dust has gone.
If there are storeys above the shop, the frontage should feel like the base of the building and not a sign stuck on it. Lining up mullions with the windows overhead is a small move that settles the whole elevation at Bognor Regis premises.
What should you budget for timber shopfronts in Bognor Regis?
As a working budget, use £3,995 to £13,995 plus VAT for a typical frontage. Your place inside that range for timber shopfronts depends mostly on how much of the existing frontage can stay and how much has to be put right first.
What consents could affect timber shopfronts in Bognor Regis?
For timber shopfronts at premises in the Bognor Regis area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.
Planning and advert applications for Bognor Regis premises normally go to Arun District Council. We check the position for your address at survey.
| Town | Bognor Regis |
|---|---|
| Area | West Sussex |
| Postcode districts | PO21, PO22 |
| Planning authority | Arun District Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 133 miles |
| Survey | Free for new work |
Questions about timber shopfronts in Bognor Regis
Will timber suffer on my Bognor Regis frontage if it gets a lot of rain?
Not if the details are right. Sloped cills, sealed end grain and plinth blocks keep water moving, and the paint system then only has to deal with the weather, not trapped damp.
Can you fit a timber front around existing tiles in Bognor Regis?
Often, yes, and it's usually worth trying. If your stallriser or entrance has good original tile, we'd measure it carefully and scribe the new joinery to it.
What should I budget for looking after a timber front in Bognor Regis?
A repaint every 5 to 7 years, plus a yearly wash and touch-up of the cills. Door gear needs checking too, since seasonal movement can throw a door out of line.
Does the Equality Act apply to a shop entrance in the Bognor Regis area?
Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.
Does a shop sign in the Bognor Regis area need advertisement consent?
Not always. In England, an unlit sign within Class 5 of the 2007 Advertisement Regulations generally needs no application, and neither does a lit sign within Class 4B. Anything outside those classes needs consent, and Class 4B isn't available in conservation areas, so check before ordering.