Looking for a front with more character on your Paisley premises? A painted timber frontage, built up in layers and proportioned to the building, has a warmth that reads from across the street.
Please have keys to any meter cupboards and shutter housings to hand when we survey in Paisley, because what sits behind them can change the drawing.

What makes timber shopfronts work well on Paisley premises?
Timber fits a night programme better than you'd think, since most of the joinery is made elsewhere. For a unit in Paisley that can't close by day, we'd fit the frame in stages at night and leave painting until the end, once the dust has gone.
A brand rollout can include timber, as long as the details repeat. For a branch in Paisley we'd use the same mouldings, colours and sign panel as your other sites, adjusting only the widths and heights to fit the opening.
If the pavement falls across your frontage, let the stallriser take up the slope and keep the glass line dead level. The eye reads the long horizontal, so Paisley premises on a slope look settled once that line is true.
How much should you set aside for timber shopfronts in Paisley?
We would budget £3,995 to £13,995 plus VAT for a typical frontage. Scope sets most of the figure, so a clear brief at the start does more for the budget than any later change of detail.
Could timber shopfronts in Paisley need planning permission?
Class 9A, Scotland's shop permitted development right, gives no route for a shopfront change. It covers Class 1A premises, but not work that alters or extends beyond the existing front, and it doesn't apply in conservation areas, National Parks or World Heritage Sites. For timber shopfronts at premises in the Paisley area, that generally means a planning application unless the external appearance isn't materially affected.
Planning and advert applications for Paisley premises normally go to Renfrewshire Council. We check the position for your address at survey.
| Town | Paisley |
|---|---|
| Area | Glasgow and Clyde |
| Postcode districts | PA1, PA2, PA3 |
| Planning authority | Renfrewshire Council |
| Building approval | Building warrant (Technical Handbook) |
| Distance from Great Barr | About 249 miles |
| Survey | Free for new work |
Questions about timber shopfronts in Paisley
How much disruption will a timber front cause in my Paisley shop?
Expect more time on site than an aluminium front, typically 3 to 7 days with the painting. Closed-day or out-of-hours fitting can be arranged, and the opening stays boarded and secure between stages.
Is timber a sensible choice for my Paisley frontage?
Usually, if you're happy with a repaint every 5 to 7 years. A survey shows how exposed the front is and whether the structure behind it is sound, and we'll tell you if aluminium would serve you better.
Will timber suffer on my Paisley frontage if it gets a lot of rain?
Not if the details are right. Sloped cills, sealed end grain and plinth blocks keep water moving, and the paint system then only has to deal with the weather, not trapped damp.
Does the Equality Act cover a shop entrance in the Paisley area?
Yes. The Equality Act 2010 applies in Scotland as part of Great Britain, and its anticipatory duty expects reasonable steps to remove, alter or avoid physical features that disadvantage disabled people generally. BS 8300-2:2018 is the current British Standard for accessible buildings.
Which way must a fire exit door open on a shop in the Paisley area?
In the direction of escape. Regulation 13(2) of the Fire Safety (Scotland) Regulations 2006 also rules out sliding and revolving doors on a dedicated fire exit and says fire exit doors can't be locked against immediate use. Duties sit with dutyholders under Part 3 of the Fire (Scotland) Act 2005, meaning the employer and any person with control of the premises.