0800 088 6248 Get a guide price
  1. Home
  2. Areas
  3. East Sussex
  4. Peacehaven

Shopfronts in Peacehaven

Surveyed in person, priced line by line and fitted around your Peacehaven trading hours.

If your business is in Peacehaven, the frontage is the first thing a customer judges. We draw it around your opening and your brand, then fit it around your trading hours.

Bring whatever you have to the survey in Peacehaven: brand guidelines, lease plans, old drawings or a photo of a frontage you admire.

A bespoke shopfront of the kind we design for Peacehaven

Which types of shopfront suit Peacehaven premises?

For Peacehaven premises that want slim lines in almost any colour, we fit powder-coated aluminium shopfronts drawn to the opening. They suit long frontages and modern units well, with glazing bars placed to answer the building above.

Timber shopfronts suit older Peacehaven buildings with deep mouldings, panelled stallrisers and a proper cornice. We can draw a new front in that language or rebuild what is there, painted or stained to suit.

Where a fascia has crept down over the years, lifting it back to its original line can add real height to the glass. Check what sits behind it first at Peacehaven premises, since a shutter box or old beam may set the limit.

What consents will shopfronts in Peacehaven need?

England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for shopfront work at premises in the Peacehaven area: a planning application, or work that doesn't materially affect the external appearance.

Lighting moves a sign out of Class 5 in England, because that class allows illumination only for medical-type notices. Class 4B then applies at premises in the Peacehaven area: halo or character-only lighting, static, with the lowest part at least 2.5m up. Brightness is capped at 600 cd/m² on signs up to 10m² and 300 cd/m² above that, and anything outside these limits needs advertisement consent.

At survey we check how things stand for your building, although applications for planning permission or advertisement consent here normally go to Lewes District Council.

Peacehaven at a glance
TownPeacehaven
AreaEast Sussex
Postcode districtsBN10
Planning authorityLewes District Council
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 146 miles
SurveyFree for new work

What can we fit in Peacehaven?

Questions about shopfronts in Peacehaven

Where do you travel from for Peacehaven jobs?

We travel from Great Barr, Birmingham. Surveys start from there, and the work itself is carried out by vetted teams working under S&K Glazing, the same arrangement we use across East Sussex.

Can you work around opening hours at Peacehaven premises?

Yes. Tell us your quietest days and we'll plan around them, with closed-day or out-of-hours installation available by arrangement.

What do I receive after a survey at Peacehaven premises?

You receive one itemised written quotation, valid for 90 days. Scale drawings and sign-off of the dimensions come before anything is made, and nothing is ordered until you accept.

What rules apply to a fire exit door through a shopfront in the Peacehaven area?

It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.

Do roller shutters need planning permission in the Peacehaven area?

Usually yes. Installing or replacing a security grill or shutter on a shopfront is expressly outside England's shop permitted development rights, so the only way to avoid an application is work that doesn't materially affect the appearance. Ask the council before ordering.

Got premises in Peacehaven?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price