If your Arnold unit needs a sharper face on the street, aluminium is usually the simplest route. Fabrication typically takes 2 to 4 weeks and fitting 1 to 5 days, arranged around your trading hours where needed.
Expect us to measure the opening, photograph the existing front and check how materials will reach it on the day, at a time you have agreed.

What makes aluminium shopfronts work well on Arnold premises?
Where a unit in Arnold can't afford a closed day, a night fit is worth pricing. Strip-out and frame go in over consecutive nights, with temporary boarding between shifts, so the shop opens each morning weathertight and secure.
If your Arnold branch is one stop in a wider rollout, we'd adapt your standard details to this opening instead of forcing the opening to fit them. Section, colour and fixings stay the same as the rest of the estate, while mullion spacing and fascia depth answer to the building.
Where units share one long run of fascia, breaking the height makes you stand out for the wrong reason. If that describes your Arnold parade, keep the line and win attention with lettering, lighting and what's in the window.
Could aluminium shopfronts in Arnold need planning permission?
England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for aluminium shopfronts at premises in the Arnold area: a planning application, or work that doesn't materially affect the external appearance.
For Arnold, the usual route for planning and advert applications is through Gedling Borough Council, and we confirm that when we visit.
How much should you set aside for aluminium shopfronts in Arnold?
We would budget £2,495 to £11,995 plus VAT for a typical 3 to 7 m frontage. Scope sets most of the figure, so a clear brief at the start does more for the budget than any later change of detail.
| Town | Arnold |
|---|---|
| Area | Nottinghamshire |
| Postcode districts | NG3, NG4, NG5, NG6 |
| Planning authority | Gedling Borough Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 45 miles |
| Survey | Free for new work |
Questions about aluminium shopfronts in Arnold
Can I keep trading while my Arnold shopfront is replaced?
Often, yes. The front can usually be replaced a section at a time, with temporary screens keeping the shop secure, and a closed-day or out-of-hours fit can be arranged if that suits you better.
What do you need before surveying a unit in Arnold?
An address, a few photos and a rough idea of what you have in mind are enough to book the survey. If you have a lease, a landlord's specification or brand guidelines, send those too, because they shape the drawing.
Will an aluminium front make my Arnold shop warmer?
It can, though the glass matters more than the frame. A thermally broken section with double-glazed units loses less heat than single glazing, and a well-sealed door is often the change you notice most on a cold day.
Does a new shopfront in the Arnold area need Building Regulations approval?
Assume yes until building control says otherwise. England has no like-for-like exemption, though registered installers can self-certify replacement windows and doors in non-dwellings. That route doesn't cover structural glass, curtain walling or revolving doors.
Do I need listed building consent for a shopfront in the Arnold area?
Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.