0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Aluminium shopfronts
  4. Barking

Aluminium shopfronts in Barking

Survey, drawings and a written price for aluminium shopfronts in Barking.

If your Barking unit needs a sharper face on the street, aluminium is usually the simplest route. Fabrication typically takes 2 to 4 weeks and fitting 1 to 5 days, arranged around your trading hours where needed.

It helps if you can be there when we visit Barking, since five minutes walking the frontage together answers more than a long email.

Dark bronze aluminium shopfront with slim frames, a low stallriser and a glazed entrance door

What makes aluminium shopfronts work well on Barking premises?

Where a unit in Barking can't afford a closed day, a night fit is worth pricing. Strip-out and frame go in over consecutive nights, with temporary boarding between shifts, so the shop opens each morning weathertight and secure.

A narrow Barking unit gains from fewer parts. Under about 4m wide, we'd offset the door and use one large pane rather than a central door with two slivers of glass either side, which makes the front feel wider than it measures.

If there are storeys above the shop, the frontage should feel like the base of the building and not a sign stuck on it. Lining up mullions with the windows overhead is a small move that settles the whole elevation at Barking premises.

Could aluminium shopfronts in Barking need planning permission?

England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for aluminium shopfronts at premises in the Barking area: a planning application, or work that doesn't materially affect the external appearance.

Expect planning and advert applications here to go to London Borough of Barking and Dagenham in the normal way. We check what that means for your building when we survey it in Barking.

How much should you set aside for aluminium shopfronts in Barking?

A sensible starting budget is £2,495 to £11,995 plus VAT for a typical 3 to 7 m frontage. What shifts the figure is whatever can't be seen yet, such as the condition behind the old frontage or the services running through it.

Barking at a glance
TownBarking
AreaGreater London
Postcode districtsIG11, RM10, RM8, RM9
Planning authorityLondon Borough of Barking and Dagenham
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 110 miles
SurveyFree for new work

Questions about aluminium shopfronts in Barking

What do you need before surveying a unit in Barking?

An address, a few photos and a rough idea of what you have in mind are enough to book the survey. If you have a lease, a landlord's specification or brand guidelines, send those too, because they shape the drawing.

Can a sign and shutter be fitted with the frame in Barking?

Yes, and it's usually the neater way to do it. One contract covers the frontage, so the shutter box, fascia and sign fixings are drawn together and nobody is left waiting for another trade.

Can you match a shopfront I like elsewhere in Greater London?

Usually, yes. Send the photo and address, and we'll work out the section, colour and proportions behind it, then adapt them to your Barking opening.

Do I need listed building consent for a shopfront in the Barking area?

Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.

Does the Equality Act apply to a shop entrance in the Barking area?

Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.

Planning aluminium shopfronts in Barking?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price