0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Curtain walling
  4. Maida Hill

Curtain walling in Maida Hill

Designed for your opening in Maida Hill, fitted around your trading hours.

For a facade in Maida Hill, the grid matters more than any single pane. Mullions, transoms and spandrels are drawn together so the elevation reads as one composition from across the road.

Expect us to measure the opening, photograph the existing front and check how materials will reach it on the day, at a time you have agreed.

Aluminium curtain walling with slim mullions across a two-storey commercial facade at dusk

What makes curtain walling work well on Maida Hill premises?

If your Maida Hill premises have a concrete frame, we open up a sample of slab edges at survey and plan brackets around what is really there. Steel frames and older masonry piers each need a different fixing, so nothing is priced from assumptions.

Unloading is worth thinking through early on any Maida Hill site with restricted access. Mullions can run to 6m or more, so we look at lifting routes, storage and where a delivery can stop.

Where units share one long run of fascia, breaking the height makes you stand out for the wrong reason. If that describes your Maida Hill parade, keep the line and win attention with lettering, lighting and what's in the window.

Could curtain walling in Maida Hill need planning permission?

Security grilles and shutters are named in England's rules: installing or replacing one on a shopfront sits outside the shop permitted development rights. The frontage itself is treated the same way, so for curtain walling at premises in the Maida Hill area, building work that materially affects the appearance needs planning permission. Confirm the position with the council before anything is ordered.

Expect planning and advert applications here to go to Westminster City Council in the normal way. We check what that means for your building when we survey it in Maida Hill.

How much should you set aside for curtain walling in Maida Hill?

A sensible starting budget is £550 to £1,250 plus VAT per m². What shifts the figure is whatever can't be seen yet, such as the condition behind the old frontage or the services running through it.

Maida Hill at a glance
TownMaida Hill
AreaGreater London
Postcode districtsNW6, NW8, W2, W9
Planning authorityWestminster City Council
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 102 miles
SurveyFree for new work

Does Westminster City Council publish shopfront guidance?

Yes, Shopfronts, Blinds and Signs - A Guide to their Design (1993). It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:

  • Roller shutters will not normally be given consent, and internally fitted brick-bond grilles are the preferred solution.
  • Large internally lit box signs are generally inappropriate, while externally lit fascias and back-lit or halo-lit letters are accepted.
  • Projecting signs need at least 2.6m clearance above the pavement and should sit at fascia level, centred on a pilaster.

Read our summary of the Westminster guidance

Questions about curtain walling in Maida Hill

Can you replace failing curtain walling on premises in Maida Hill?

Yes. We survey the frame, brackets and seals first, because some elevations only need new glass and gaskets. If the frame itself has failed, we draw a replacement that can be phased around the building's use.

Can part of an elevation in Maida Hill be done first?

Yes, provided the break falls at a sensible mullion. Phasing can spread cost and disruption, although two visits usually cost more than one. We would draw the whole elevation first so the second phase matches.

Will you coordinate with my architect or main contractor in Maida Hill?

Yes. We can work to their drawings and programme, and we supply shop drawings for their review before anything is made. Your named contact stays the single route for questions on our package.

What rules apply to a fire exit door through a shopfront in the Maida Hill area?

It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.

Do roller shutters need planning permission in the Maida Hill area?

Usually yes. Installing or replacing a security grill or shutter on a shopfront is expressly outside England's shop permitted development rights, so the only way to avoid an application is work that doesn't materially affect the appearance. Ask the council before ordering.

Planning curtain walling in Maida Hill?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price