Daylight deep into the floor plate is often what makes curtain walling worth the money. For Newport premises we weigh that against solar gain and glare, so the glass works in July as well as in January.
It helps if you can be there when we visit Newport, since five minutes walking the frontage together answers more than a long email.

What goes into getting curtain walling right in Newport?
Unloading is worth thinking through early on any Newport site with restricted access. Mullions can run to 6m or more, so we look at lifting routes, storage and where a delivery can stop.
Should the floors above stay occupied, the work can be phased bay by bay, with temporary weathering at the end of each shift. Tenants keep their rooms dry and the old elevation comes out in an order that suits the building.
Where the building has good brick or stone around the opening, set the frame back in the reveal so the masonry can be seen. On Newport premises with a flat elevation, that deep reveal throws a shadow line that adds real depth in low sun.
Which applications might curtain walling in Newport involve?
Going by Part 42 of the 1995 Order as inserted in 2014, Wales has no permitted development route for changing a shopfront. The right covers A1 and A2 premises, but it excludes creating, altering or replacing a shopfront, or fitting or replacing a security grill or shutter on one, and it doesn't apply on Article 1(5) land. For curtain walling at premises in the Newport area, that leaves a planning application, or work that leaves the appearance materially unchanged.
Planning and advert applications for Newport premises normally go to Newport City Council. We check the position for your address at survey.
How much could curtain walling in Newport cost you?
As a working budget, use £550 to £1,250 plus VAT per m². Your place inside that range for curtain walling depends mostly on how much of the existing frontage can stay and how much has to be put right first.
| Town | Newport |
|---|---|
| Area | Gwent |
| Postcode districts | NP10, NP18, NP19, NP20 |
| Planning authority | Newport City Council |
| Building approval | Building Regulations (Approved Documents for Wales) |
| Distance from Great Barr | About 81 miles |
| Survey | Free for new work |
Questions about curtain walling in Newport
Can you replace failing curtain walling on premises in Newport?
Yes. We survey the frame, brackets and seals first, because some elevations only need new glass and gaskets. If the frame itself has failed, we draw a replacement that can be phased around the building's use.
Can part of an elevation in Newport be done first?
Yes, provided the break falls at a sensible mullion. Phasing can spread cost and disruption, although two visits usually cost more than one. We would draw the whole elevation first so the second phase matches.
How disruptive is curtain walling for neighbours in Newport?
Most disruption comes from access equipment and deliveries, not from noisy work. We plan unloading and any scaffold around nearby premises, and we keep the working area screened and tidy at the end of each shift.
Is planning permission needed for a new shopfront in the Newport area?
Usually yes, if the work materially affects the external appearance, because Wales has no permitted development route for changing a shopfront. Most of the Planning (Wales) Act 2026 hasn't been commenced yet, so the existing rules apply. A true like-for-like replacement usually avoids an application, and the council confirms the position.
Can a shop fire exit in the Newport area use a sliding door?
No, a dedicated fire exit can't be a sliding or revolving door. In Wales, article 14(2) of the Regulatory Reform (Fire Safety) Order 2005 also says fire exit doors must open in the direction of escape and can't be locked against immediate use. The responsible person holds that duty, normally the employer or whoever controls the premises for a business, otherwise the owner.