Curtain walling gives Oadby premises a glazed elevation that runs past the floor edges, where a standard shopfront frame would run out of span. We measure the structure first, then set the grid out to suit the building.
It helps if you can be there when we visit Oadby, since five minutes walking the frontage together answers more than a long email.

What should you think about before commissioning curtain walling in Oadby?
If your Oadby premises have a concrete frame, we open up a sample of slab edges at survey and plan brackets around what is really there. Steel frames and older masonry piers each need a different fixing, so nothing is priced from assumptions.
Where the elevation faces south or west, solar control glass can do more for comfort than any blind. If it looks north, we would usually keep the glass clear and neutral, so the building does not turn dull on a grey day.
Where the building has good brick or stone around the opening, set the frame back in the reveal so the masonry can be seen. On Oadby premises with a flat elevation, that deep reveal throws a shadow line that adds real depth in low sun.
What is a realistic budget for curtain walling in Oadby?
As a working budget, use £550 to £1,250 plus VAT per m². Your place inside that range for curtain walling depends mostly on how much of the existing frontage can stay and how much has to be put right first.
Who approves curtain walling in Oadby?
For curtain walling at premises in the Oadby area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.
For Oadby, the usual route for planning and advert applications is through Oadby and Wigston Borough Council, and we confirm that when we visit.
| Town | Oadby |
|---|---|
| Area | Leicestershire |
| Postcode districts | LE2 |
| Planning authority | Oadby and Wigston Borough Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 35 miles |
| Survey | Free for new work |
Questions about curtain walling in Oadby
What should I send before a survey of my Oadby premises?
The address, a few photographs and any existing drawings are enough to start. Tell us how the building is used and which floors stay occupied, because that shapes the access plan.
Can part of an elevation in Oadby be done first?
Yes, provided the break falls at a sensible mullion. Phasing can spread cost and disruption, although two visits usually cost more than one. We would draw the whole elevation first so the second phase matches.
Will you coordinate with my architect or main contractor in Oadby?
Yes. We can work to their drawings and programme, and we supply shop drawings for their review before anything is made. Your named contact stays the single route for questions on our package.
What rules apply to a fire exit door through a shopfront in the Oadby area?
It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.
Do I need planning permission to change a shopfront in the Oadby area?
Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.