Many tired frontages are closer to good than they look. On Shoreditch premises a new sign, fresh colour and better glass can do most of the work of a full replacement.
Bring whatever you have to the survey in Shoreditch: brand guidelines, lease plans, old drawings or a photo of a frontage you admire.

What makes shopfront refurbishment work well on Shoreditch premises?
Where the frontage is timber, we probe the sills, bottom rails and door jambs before quoting. Rot usually starts low, and a spliced repair in hardwood can save more of the joinery than you might expect.
If the glass is old, we look for the etched safety mark in the corner of each pane. Panes without one, in the door or at low level, should be replaced while the frontage is being worked on.
If the pavement falls across your frontage, let the stallriser take up the slope and keep the glass line dead level. The eye reads the long horizontal, so Shoreditch premises on a slope look settled once that line is true.
Could shopfront refurbishment in Shoreditch need planning permission?
England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for shopfront refurbishment at premises in the Shoreditch area: a planning application, or work that doesn't materially affect the external appearance.
Shoreditch applications for planning permission or advertisement consent are normally handled by London Borough of Hackney. Our survey includes a check of the position for your address.
How much should you set aside for shopfront refurbishment in Shoreditch?
Until the survey is done, plan on £1,995 to £8,995 plus VAT depending on what is kept. Unusual sizes, fine detail and phased working push the figure up, while a simple brief and clear access keep it toward the lower end.
| Town | Shoreditch |
|---|---|
| Area | Greater London |
| Postcode districts | E1, EC2 |
| Planning authority | London Borough of Hackney |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 105 miles |
| Survey | Free for new work |
Questions about shopfront refurbishment in Shoreditch
Will the work match my other premises in Greater London?
Yes, if you can share colour references and sign files from an existing site. We match finishes as closely as the frame allows, and we show you a sample first.
Can you refurbish just the sign and door on my Shoreditch frontage?
Yes. A new sign and door gear can make a big difference on their own. We would look at how they sit with the frame and suggest a colour to tie them together.
What if you find more damage on my Shoreditch premises?
We stop, photograph it and show you the cost before going further. Nothing extra goes ahead without your agreement.
Does a new shopfront in the Shoreditch area need Building Regulations approval?
Assume yes until building control says otherwise. England has no like-for-like exemption, though registered installers can self-certify replacement windows and doors in non-dwellings. That route doesn't cover structural glass, curtain walling or revolving doors.
Does the Equality Act apply to a shop entrance in the Shoreditch area?
Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.