We make timber shopfronts for Bromley premises, from plain painted frames to full cornice and console fronts. Every one starts with a measured survey and scale drawings.
Surveys for Bromley are booked with you directly. Tell us your quieter days and we'll work around them.

How would we approach timber shopfronts for your Bromley premises?
Timber fits a night programme better than you'd think, since most of the joinery is made elsewhere. For a unit in Bromley that can't close by day, we'd fit the frame in stages at night and leave painting until the end, once the dust has gone.
A brand rollout can include timber, as long as the details repeat. For a branch in Bromley we'd use the same mouldings, colours and sign panel as your other sites, adjusting only the widths and heights to fit the opening.
If there are storeys above the shop, the frontage should feel like the base of the building and not a sign stuck on it. Lining up mullions with the windows overhead is a small move that settles the whole elevation at Bromley premises.
What should you budget for timber shopfronts in Bromley?
Until the survey is done, plan on £3,995 to £13,995 plus VAT for a typical frontage. Unusual sizes, fine detail and phased working push the figure up, while a simple brief and clear access keep it toward the lower end.
What consents could affect timber shopfronts in Bromley?
A true like-for-like replacement usually needs no planning permission in England, because the external appearance isn't materially affected. New materials, a different glass line or altered proportions usually do count as material, so for timber shopfronts at premises in the Bromley area, an application is then likely. The council confirms which side of that line a job falls on.
Bromley applications for planning permission or advertisement consent are normally handled by London Borough of Bromley. Our survey includes a check of the position for your address.
| Town | Bromley |
|---|---|
| Area | Greater London |
| Postcode districts | BR1 |
| Planning authority | London Borough of Bromley |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 114 miles |
| Survey | Free for new work |
Questions about timber shopfronts in Bromley
Will timber suffer on my Bromley frontage if it gets a lot of rain?
Not if the details are right. Sloped cills, sealed end grain and plinth blocks keep water moving, and the paint system then only has to deal with the weather, not trapped damp.
Is timber a sensible choice for my Bromley frontage?
Usually, if you're happy with a repaint every 5 to 7 years. A survey shows how exposed the front is and whether the structure behind it is sound, and we'll tell you if aluminium would serve you better.
What should I budget for looking after a timber front in Bromley?
A repaint every 5 to 7 years, plus a yearly wash and touch-up of the cills. Door gear needs checking too, since seasonal movement can throw a door out of line.
Do I need planning permission to change a shopfront in the Bromley area?
Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.
What rules apply to a fire exit door through a shopfront in the Bromley area?
It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.