Colour and craft do the work on a timber front in Strabane. We test paint on your actual frontage, draw any moulding that matters at full size, and keep every dimension on paper for you to sign off.
It helps if you can be there when we visit Strabane, since five minutes walking the frontage together answers more than a long email.

What should you think about before commissioning timber shopfronts in Strabane?
Narrow units suit timber well, because mouldings add interest where there's little width to work with. On a slim Strabane frontage we'd keep one strong pane, a panelled door and a fascia that doesn't crowd them.
Timber fits a night programme better than you'd think, since most of the joinery is made elsewhere. For a unit in Strabane that can't close by day, we'd fit the frame in stages at night and leave painting until the end, once the dust has gone.
If your Strabane unit is narrow, a central door can split a small window into two weak ones. Moving the door to one side gives you a single confident pane, provided the layout inside still works.
Who approves timber shopfronts in Strabane?
A true like-for-like replacement usually needs no planning permission in Northern Ireland, since the external appearance isn't materially affected. Altered materials, proportions or sightlines usually do count, so for timber shopfronts at premises in the Strabane area, planning permission is then likely to be needed. The council confirms where a job sits.
For Strabane, the usual route for planning and advert applications is through Derry City and Strabane District Council, and we confirm that when we visit.
What is a realistic budget for timber shopfronts in Strabane?
Allow £3,995 to £13,995 plus VAT for a typical frontage. Size and specification set most of that figure for timber shopfronts, and the rest depends on what the survey finds on site.
| Town | Strabane |
|---|---|
| Area | County Tyrone |
| Postcode districts | BT82 |
| Planning authority | Derry City and Strabane District Council |
| Building approval | Building Control (Technical Booklets) |
| Survey | Free for new work |
Questions about timber shopfronts in Strabane
Will timber suffer on my Strabane frontage if it gets a lot of rain?
Not if the details are right. Sloped cills, sealed end grain and plinth blocks keep water moving, and the paint system then only has to deal with the weather, not trapped damp.
Can you copy a timber shopfront I've seen in County Tyrone?
We can work from your photo and borrow what makes it succeed, including proportions, moulding sizes and colour. The front is then drawn to your own Strabane opening.
Is timber a sensible choice for my Strabane frontage?
Usually, if you're happy with a repaint every 5 to 7 years. A survey shows how exposed the front is and whether the structure behind it is sound, and we'll tell you if aluminium would serve you better.
What rules apply to a fire exit door through a shopfront in the Strabane area?
It must open in the direction of escape, it can't be locked against immediate use, and a dedicated fire exit can't be sliding or revolving. In Northern Ireland that comes from regulation 13(2) of the Fire Safety Regulations (Northern Ireland) 2010, and duties sit with dutyholders, meaning the employer and any person with control of the premises, whom the Fire and Rescue Service calls the appropriate person. An outward door may also need Department consent under Article 56 of the Roads (Northern Ireland) Order 1993.
Who decides listed building consent for a shopfront in the Strabane area?
The council decides, under section 85 of the Planning Act (Northern Ireland) 2011. The Department for Communities' Historic Environment Division is a statutory consultee on applications. Unauthorised works are a criminal offence, so ask before anything is removed.