If your New Barnet unit has a wide opening and a front that stays shut all year, folding panels could change how you use it. Sets are typically ready 4 to 7 weeks after sign-off, with 2 to 4 days on site arranged around your trading.
Measuring the opening is the easy part of a survey in New Barnet. We also look at the beam above, the pavement fall and any meters or drains nearby.

How would we approach bi-folding shopfronts for your New Barnet premises?
If your New Barnet frontage faces the sun, a bi-fold doubles as ventilation. We'd pair it with an awning so the room stays usable at midday, and look at solar control glass for the days the set stays closed.
For a restaurant group opening in New Barnet, a bi-fold can carry the brand's look from site to site. We'd standardise the panel section, colour and hardware, then vary the panel count and stack side to suit each opening.
Where the building has good brick or stone around the opening, set the frame back in the reveal so the masonry can be seen. On New Barnet premises with a flat elevation, that deep reveal throws a shadow line that adds real depth in low sun.
What should you budget for bi-folding shopfronts in New Barnet?
The guide for bi-folding shopfronts is £5,195 to £13,995 plus VAT for a typical opening. Expect the lower end for simple work with clear access, and the upper end where detail, finish or awkward conditions add hours.
What consents could affect bi-folding shopfronts in New Barnet?
For bi-folding shopfronts at premises in the New Barnet area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.
We confirm the position at survey, because a boundary or a special designation can change who handles the file, but applications from New Barnet premises normally go to London Borough of Barnet.
| Town | New Barnet |
|---|---|
| Area | Greater London |
| Postcode districts | EN4, EN5, N14, N20 |
| Planning authority | London Borough of Barnet |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 96 miles |
| Survey | Free for new work |
Questions about bi-folding shopfronts in New Barnet
Will I lose a table to the stack in my New Barnet restaurant?
Possibly one, but careful layout usually avoids it. We draw the folded panels on your floor plan, then look at moving the stack to a quieter corner or splitting the set in two.
Who do I speak to about a bi-fold in New Barnet?
Your named contact stays the same from the first visit to the final adjustment. Fitting is carried out by vetted teams working under S&K Glazing, travelling from Great Barr.
Which way should the panels fold at my New Barnet premises?
Inward is the usual answer, since panels folded into the room stay clear of people on the pavement. We'd draw the options where the room allows, and you choose against your seating plan.
Does the Equality Act apply to a shop entrance in the New Barnet area?
Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.
Do I need planning permission to change a shopfront in the New Barnet area?
Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.