From a single-bay stair tower to a full frontage, we design and fit curtain walling for premises in Perth and the surrounding parts of Perth and Kinross. One contract covers the frame, the glass and the junction with the shopfront below.
Nothing gets ordered off the back of a survey in Perth, because its job is to give us the numbers to draw and price from.

Where should you begin with curtain walling in Perth?
Should the floors above stay occupied, the work can be phased bay by bay, with temporary weathering at the end of each shift. Tenants keep their rooms dry and the old elevation comes out in an order that suits the building.
If the ground floor of your Perth premises is a shop, we carry the curtain wall grid down into the shopfront below. Door heads, fascia line and transoms then line up by design.
If the pavement falls across your frontage, let the stallriser take up the slope and keep the glass line dead level. The eye reads the long horizontal, so Perth premises on a slope look settled once that line is true.
What sign-off might you need for curtain walling in Perth?
Class 9A, Scotland's shop permitted development right, gives no route for a shopfront change. It covers Class 1A premises, but not work that alters or extends beyond the existing front, and it doesn't apply in conservation areas, National Parks or World Heritage Sites. For curtain walling at premises in the Perth area, that generally means a planning application unless the external appearance isn't materially affected.
We confirm the position at survey, because a boundary or a special designation can change who handles the file, but applications from Perth premises normally go to Perth and Kinross Council.
What price should you expect for curtain walling in Perth?
Until the survey is done, plan on £550 to £1,250 plus VAT per m². Unusual sizes, fine detail and phased working push the figure up, while a simple brief and clear access keep it toward the lower end.
| Town | Perth |
|---|---|
| Area | Perth and Kinross |
| Postcode districts | PH1, PH2 |
| Planning authority | Perth and Kinross Council |
| Building approval | Building warrant (Technical Handbook) |
| Distance from Great Barr | About 273 miles |
| Survey | Free for new work |
Questions about curtain walling in Perth
Who do I deal with during a curtain walling job in Perth?
You have one named contact from survey to handover. The contract is with S&K Glazing Limited, and vetted teams working under S&K Glazing carry out the work.
Can part of an elevation in Perth be done first?
Yes, provided the break falls at a sensible mullion. Phasing can spread cost and disruption, although two visits usually cost more than one. We would draw the whole elevation first so the second phase matches.
What should I send before a survey of my Perth premises?
The address, a few photographs and any existing drawings are enough to start. Tell us how the building is used and which floors stay occupied, because that shapes the access plan.
Does a shop sign in the Perth area need advertisement consent?
Not always. Scotland's 1984 Regulations let an unlit sign within Class IV(1) go up without an application, and Class VI does the same for a lit sign with each character lit from within. Class VI isn't available in conservation areas, and one council says lit signs always need express consent, so ask first.
Do I need planning permission to alter a shopfront in the Perth area?
Usually yes, if the work materially affects the external appearance. Class 9A, Scotland's shop permitted development right, doesn't cover work that alters or extends beyond the existing front. A true like-for-like replacement usually needs no permission, and the council confirms the position.