Want a front in Perth that feels made rather than assembled? Timber does that well, provided the mouldings are in scale and the joinery is detailed to shed water.
Please have keys to any meter cupboards and shutter housings to hand when we survey in Perth, because what sits behind them can change the drawing.

What makes timber shopfronts work well on Perth premises?
Timber fits a night programme better than you'd think, since most of the joinery is made elsewhere. For a unit in Perth that can't close by day, we'd fit the frame in stages at night and leave painting until the end, once the dust has gone.
If your Perth premises have a deep recessed entrance, timber can make it feel like a welcome. We'd panel the returns, add a lit soffit and lay a hard-wearing threshold, keeping the end grain of every post clear of the wet.
If your Perth unit sits in a Victorian parade, the old pilasters usually set the rhythm, so a new front should land on them and not run past them. Keep that line and even a modern frame looks as though it belongs.
Could timber shopfronts in Perth need planning permission?
Shutters aren't named in Class 9A, so in Scotland they usually fall to the appearance test. The same goes for timber shopfronts at premises in the Perth area: building work that materially affects the external appearance needs planning permission, and a true like-for-like usually doesn't. Ask the council to confirm the position for your site.
Expect planning and advert applications here to go to Perth and Kinross Council in the normal way. We check what that means for your building when we survey it in Perth.
How much should you set aside for timber shopfronts in Perth?
As a working budget, use £3,995 to £13,995 plus VAT for a typical frontage. Your place inside that range for timber shopfronts depends mostly on how much of the existing frontage can stay and how much has to be put right first.
| Town | Perth |
|---|---|
| Area | Perth and Kinross |
| Postcode districts | PH1, PH2 |
| Planning authority | Perth and Kinross Council |
| Building approval | Building warrant (Technical Handbook) |
| Distance from Great Barr | About 273 miles |
| Survey | Free for new work |
Questions about timber shopfronts in Perth
How much disruption will a timber front cause in my Perth shop?
Expect more time on site than an aluminium front, typically 3 to 7 days with the painting. Closed-day or out-of-hours fitting can be arranged, and the opening stays boarded and secure between stages.
Can a timber front take a modern sign in Perth?
Yes. Hand-painted letters suit a timber fascia well, and raised letters or a concealed trough light work too. We draw the sign and the joinery together, so the fixings don't cut through a moulding.
Is timber a sensible choice for my Perth frontage?
Usually, if you're happy with a repaint every 5 to 7 years. A survey shows how exposed the front is and whether the structure behind it is sound, and we'll tell you if aluminium would serve you better.
Do roller shutters need planning permission in the Perth area?
Usually yes, if they materially affect the external appearance. Class 9A doesn't name shutters, so in Scotland treat them as falling to the appearance test rather than assuming a permitted development route. Ask the council before ordering, as this is a reading of the rules and not an official statement.
Which way must a fire exit door open on a shop in the Perth area?
In the direction of escape. Regulation 13(2) of the Fire Safety (Scotland) Regulations 2006 also rules out sliding and revolving doors on a dedicated fire exit and says fire exit doors can't be locked against immediate use. Duties sit with dutyholders under Part 3 of the Fire (Scotland) Act 2005, meaning the employer and any person with control of the premises.