A well-made timber front should still look good in Dundee long after the first coat of paint has gone. That comes from choosing a durable timber, sealing the end grain and keeping water away from the bottom of every member.
Measuring the opening is the easy part of a survey in Dundee. We also look at the beam above, the pavement fall and any meters or drains nearby.

How would we approach timber shopfronts for your Dundee premises?
In a parade of mixed fronts in Dundee, painted timber can lift a unit without shouting. We'd take the height of the neighbouring cills and fascias, then let the depth of the mouldings and a considered colour do the talking.
If your Dundee premises have a deep recessed entrance, timber can make it feel like a welcome. We'd panel the returns, add a lit soffit and lay a hard-wearing threshold, keeping the end grain of every post clear of the wet.
Where units share one long run of fascia, breaking the height makes you stand out for the wrong reason. If that describes your Dundee parade, keep the line and win attention with lettering, lighting and what's in the window.
What should you budget for timber shopfronts in Dundee?
Our guide band is £3,995 to £13,995 plus VAT for a typical frontage. Scope is the biggest lever, so a tighter brief for timber shopfronts brings the figure down faster than any change of detail.
What consents could affect timber shopfronts in Dundee?
Section 26 of the Town and Country Planning (Scotland) Act 1997 sets the test: work that doesn't materially affect the external appearance isn't development. For timber shopfronts at premises in the Dundee area, anything that does needs planning permission, and a true like-for-like replacement usually doesn't. The council confirms how that applies to each site.
We confirm the position at survey, because a boundary or a special designation can change who handles the file, but applications from Dundee premises normally go to Dundee City Council.
| Town | Dundee |
|---|---|
| Area | Angus and Dundee |
| Postcode districts | DD1, DD2, DD3, DD4 |
| Planning authority | Dundee City Council |
| Building approval | Building warrant (Technical Handbook) |
| Distance from Great Barr | About 274 miles |
| Survey | Free for new work |
Questions about timber shopfronts in Dundee
Do you make the joinery for Dundee shops to order?
Yes. Every length is made to the signed-off drawings for your opening, then brought to Dundee from Great Barr by vetted teams working under S&K Glazing.
Can you fit a timber front around existing tiles in Dundee?
Often, yes, and it's usually worth trying. If your stallriser or entrance has good original tile, we'd measure it carefully and scribe the new joinery to it.
Will timber suffer on my Dundee frontage if it gets a lot of rain?
Not if the details are right. Sloped cills, sealed end grain and plinth blocks keep water moving, and the paint system then only has to deal with the weather, not trapped damp.
Do roller shutters need planning permission in the Dundee area?
Usually yes, if they materially affect the external appearance. Class 9A doesn't name shutters, so in Scotland treat them as falling to the appearance test rather than assuming a permitted development route. Ask the council before ordering, as this is a reading of the rules and not an official statement.
Do I need planning permission to alter a shopfront in the Dundee area?
Usually yes, if the work materially affects the external appearance. Class 9A, Scotland's shop permitted development right, doesn't cover work that alters or extends beyond the existing front. A true like-for-like replacement usually needs no permission, and the council confirms the position.