Curtain walling gives Putney premises a glazed elevation that runs past the floor edges, where a standard shopfront frame would run out of span. We measure the structure first, then set the grid out to suit the building.
Please have keys to any meter cupboards and shutter housings to hand when we survey in Putney, because what sits behind them can change the drawing.

What should you think about before commissioning curtain walling in Putney?
Unloading is worth thinking through early on any Putney site with restricted access. Mullions can run to 6m or more, so we look at lifting routes, storage and where a delivery can stop.
Should the floors above stay occupied, the work can be phased bay by bay, with temporary weathering at the end of each shift. Tenants keep their rooms dry and the old elevation comes out in an order that suits the building.
Where units share one long run of fascia, breaking the height makes you stand out for the wrong reason. If that describes your Putney parade, keep the line and win attention with lettering, lighting and what's in the window.
What is a realistic budget for curtain walling in Putney?
A sensible starting budget is £550 to £1,250 plus VAT per m². What shifts the figure is whatever can't be seen yet, such as the condition behind the old frontage or the services running through it.
Who approves curtain walling in Putney?
For curtain walling at premises in the Putney area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.
Planning and advert applications for Putney premises normally go to London Borough of Wandsworth. We check the position for your address at survey.
| Town | Putney |
|---|---|
| Area | Greater London |
| Postcode districts | SW13, SW15, SW18, SW6 |
| Planning authority | London Borough of Wandsworth |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 104 miles |
| Survey | Free for new work |
Does Wandsworth Borough Council publish shopfront guidance?
Yes, Shopfronts SPG (1988). It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:
- Stallrisers should be retained where possible and be at least 500mm high, or reach the top of the pilaster base.
- Solid external metal shutters are discouraged, with boxes set behind the fascia or recessed flush and guides colour-coated to match.
- Internally lit box fascias and projecting box signs are generally unsuitable in conservation areas and on traditional shopfronts.
Questions about curtain walling in Putney
What should I send before a survey of my Putney premises?
The address, a few photographs and any existing drawings are enough to start. Tell us how the building is used and which floors stay occupied, because that shapes the access plan.
Can you replace failing curtain walling on premises in Putney?
Yes. We survey the frame, brackets and seals first, because some elevations only need new glass and gaskets. If the frame itself has failed, we draw a replacement that can be phased around the building's use.
Is curtain walling right for a single-storey unit in Putney?
Usually not. A well-designed aluminium shopfront will span most single-storey openings with slimmer sections and lower cost. Curtain walling starts to make sense once the glass runs past a floor edge or the opening is unusually tall.
Do I need planning permission to change a shopfront in the Putney area?
Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.
What rules apply to a fire exit door through a shopfront in the Putney area?
It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.