Seen a frontage you admire? Bring the picture to our first talk about multi-site rollouts in Perth and Kinross, and we will work out what makes it succeed, from fascia depth to glass line, and what that means for your building.
Daylight is only half the brief for multi-site rollouts, because a frontage keeps working after dark. Think about how the glass, the sign and the view inside will read to someone walking past at six o'clock on a winter evening.

How do we handle multi-site rollouts for premises in Perth and Kinross?
A sample should include your awkward sites as well as your easiest. For an estate with premises in Perth and Kinross, we would pick a corner unit, a narrow unit and an older building, then test the standard against all three.
Site managers need one clear message. For premises across Perth and Kinross, we would send each a short notice with dates, access needs and a named contact, so nobody is caught out on the morning.
What consents apply to multi-site rollouts in Perth and Kinross?
Shutters aren't named in Class 9A, so in Scotland they usually fall to the appearance test. The same goes for multi-site rollouts at premises in the Perth and Kinross area: building work that materially affects the external appearance needs planning permission, and a true like-for-like usually doesn't. Ask the council to confirm the position for your site.
| Area | Perth and Kinross |
|---|---|
| Nation | Scotland |
| Towns covered | 1 |
| Main town | Perth |
| Planning regime | Scotland: 1997 Planning Act and the 1984 Advertisement Regulations |
| Building approval | Building warrant (Technical Handbook) |
| Survey | Free for new work, from our Great Barr base |
Questions about multi-site rollouts in Perth and Kinross
Can a rollout cover only my premises in Perth and Kinross?
Yes. A rollout can be a whole estate or one region, and starting in Perth and Kinross can be a sensible way to test the standard. The same design rules can then travel with the brand.
Would one person manage all my sites around Perth?
Yes, you would have one named contact for the programme. Vetted teams working under S&K Glazing would carry out the work, with each site following the same drawings and checks.
How would site surveys in Perth and Kinross be arranged?
We would agree a route and dates with you, then visit each sample site at a time that suits the manager. A survey usually takes a couple of hours and needs little from the staff on site.
Does the Equality Act cover a shop entrance in the Perth and Kinross area?
Yes. The Equality Act 2010 applies in Scotland as part of Great Britain, and its anticipatory duty expects reasonable steps to remove, alter or avoid physical features that disadvantage disabled people generally. BS 8300-2:2018 is the current British Standard for accessible buildings.
Which way must a fire exit door open on a shop in the Perth and Kinross area?
In the direction of escape. Regulation 13(2) of the Fire Safety (Scotland) Regulations 2006 also rules out sliding and revolving doors on a dedicated fire exit and says fire exit doors can't be locked against immediate use. Duties sit with dutyholders under Part 3 of the Fire (Scotland) Act 2005, meaning the employer and any person with control of the premises.