How long does a new shopfront take?

A new shopfront typically takes 1 to 5 days on site, after 2 to 4 weeks of fabrication. Where planning or advertisement consent is needed, allow a further 4 to 8 weeks before anything is ordered. These are typical ranges and never a promise, and the survey shows which end of each range your frontage sits at.

Written by the Shopfront Specialists team. Checked November 2026.

Scale elevation drawing of a shopfront with material samples laid out on a design table

How long does a shopfront take from enquiry to completion?

Add the stages together: typically 2 to 4 weeks of fabrication and 1 to 5 days on site, plus 4 to 8 weeks if consent is needed. Survey, quotation and drawings come first, and how long they take depends largely on how quickly decisions get made on your side.

A simple like-for-like aluminium replacement with no consent sits at the short end. At the long end you find a listed building with hand-run joinery, a lit sign, a landlord's approval and a shopping centre's working rules, all of which have to line up before a single bracket goes on the wall.

Nothing is ordered until your quotation has been accepted, and nothing is made until the scale drawings are signed off. That sequence can feel slow at the start, although it is what prevents a much longer delay later on.

StageTypical rangeWhat sets the time
Survey and quotationArranged with youSite access, level of detail
DrawingsDepends on the designNumber of revisions, sign-off
Consents, if needed4 to 8 weeksCouncil workload, sensitivity of site
Fabrication2 to 4 weeksCoating, glass, special items
On site1 to 5 daysWidth, strip-out, trading hours

How long does fitting take on site?

Fitting typically takes 1 to 5 days on site. A single-bay aluminium front with a clean opening can sit at the short end, while a wider frontage with a stallriser, a powered door, a sign and overnight working will push towards the long end.

Most jobs run from strip-out to frames, then glass, door, sign and final adjustment. Strip-out is the stage to watch, as the old fascia comes off and whatever is behind it finally becomes visible. A surprise at this point can add steelwork, so the opening has to be made safe and secure while a decision is taken.

Glass may be the last thing to arrive. Some panes can only be measured once the new frame is fixed, so a job can involve a return visit for final glazing, with temporary boarding between the two.

What happens during fabrication?

Fabrication typically takes 2 to 4 weeks from signed drawings, during which frames are cut, coated and assembled and the glass, door gear and signs are made. Each item follows its own queue, so the longest one sets the date.

Coatings are often the slow part. A special colour or anodised finish can sit behind other batches, whereas a standard colour moves faster. Toughened and laminated glass are made to size, so a small change to a dimension after ordering means reordering that pane. Signs tend to follow the frame, because their fixing positions depend on it.

Hold any changes until the drawings are next issued. Moving a door 50mm during fabrication sounds harmless, but it can change a frame, two panes and a threshold together.

How long does planning or sign consent take?

Consent typically takes 4 to 8 weeks once the application has been accepted as valid. A missing drawing or a wrong fee can stop that clock before it has started, so check the council's list carefully before you submit.

Sensitive sites tend to run longer. A conservation area or listed building brings in more consultees, and a lit sign can need its own application alongside the frontage. Where design changes are requested, a revision can add time even when the officer is broadly supportive.

Keep your order and your opening date separate from the application until the decision is in. Conditions on a decision notice can alter a colour, a sign or a fascia depth, and any of those can change what gets made.

What causes the biggest delays?

Waiting for someone else causes more delay than the work itself. Consents, landlords and sign-offs are the usual pinch points, and few of them show up in a fitter's programme. Most can be headed off with one early conversation: ask the landlord how its process works on day one, and agree who signs off drawings, so that comments arrive once and in one place.

  • Landlord or superior landlord approval that starts too late
  • Drawing comments that arrive in several rounds
  • A brand team changing the sign after approval
  • Structural findings once the fascia is off
  • Electrical supply for doors and signs not ready
  • Delivery and working restrictions at a shopping centre
  • Late changes to glass or colour

Do frameless, curved or heritage fronts take longer?

Usually, yes, because each of them adds a step that can't be hurried. Frameless glass normally waits for a final measure after any steelwork, as it can't be trimmed later. Curved glass needs an accurate template of the opening, and it is made and delivered with more care than a flat sheet.

Timber brings paint into the programme. Coats need time to dry between applications, and a damp week can slow site finishing considerably. Heritage work is slower for good reason, with mouldings run to match samples and old fabric repaired by hand.

Bronze and other special metals often have the longest finishing queue. Plan these frontages at the long end of every range, and allow extra time in your opening date for a final review.

How can I keep a shopfront programme on track?

Make decisions early, and put one person in charge of them. Start landlord talks when you start the design, since a lease can take longer than any planning department, and have colour references and brand artwork settled before drawings are issued.

Work backwards from your opening date and leave a margin. Book your electrician, alarm engineer and shopfitter around the same programme so that they aren't waiting for each other, and give the installers clear access on the day. A single contract and one named contact for the job helps too, because a question about the door doesn't then need three phone calls.

Common questions

Must I close during installation?

Not always. Many frontages can be phased around trading or fitted on closed days and out of hours, though a short closure can still be the simplest choice.

Can you promise a finish date?

We agree a programme with you once the survey, drawings and any consents are clear, and it stays a planned date, not a guarantee. Too much depends on what sits behind the old fascia to promise otherwise.

How early should I enquire before opening?

As early as you can, ideally when you sign the lease. Adding the typical ranges together shows that a job with consent can run to around three months once drawings are done.

What happens if a pane arrives damaged?

It has to be remade, because glass is made to size and can't be swapped from stock. The opening is boarded or the old pane kept in place until the replacement comes, which is one reason we check glass on delivery.