Looking for a front with more character on your New Romney premises? A painted timber frontage, built up in layers and proportioned to the building, has a warmth that reads from across the street.
Expect us to measure the opening, photograph the existing front and check how materials will reach it on the day, at a time you have agreed.

Where should you begin with timber shopfronts in New Romney?
In a parade of mixed fronts in New Romney, painted timber can lift a unit without shouting. We'd take the height of the neighbouring cills and fascias, then let the depth of the mouldings and a considered colour do the talking.
If your New Romney premises have a deep recessed entrance, timber can make it feel like a welcome. We'd panel the returns, add a lit soffit and lay a hard-wearing threshold, keeping the end grain of every post clear of the wet.
If your premises were once two shops, decide early whether the front should read as one or as two. One continuous fascia with a repeated bay width usually settles the elevation better than two mismatched halves, which is worth testing on any New Romney unit of that kind.
What price should you expect for timber shopfronts in New Romney?
A sensible starting budget is £3,995 to £13,995 plus VAT for a typical frontage. What shifts the figure is whatever can't be seen yet, such as the condition behind the old frontage or the services running through it.
What sign-off might you need for timber shopfronts in New Romney?
England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for timber shopfronts at premises in the New Romney area: a planning application, or work that doesn't materially affect the external appearance.
Planning and advert applications for New Romney premises normally go to Folkestone and Hythe District Council. We check the position for your address at survey.
| Town | New Romney |
|---|---|
| Area | Kent |
| Postcode districts | TN28 |
| Planning authority | Folkestone and Hythe District Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 163 miles |
| Survey | Free for new work |
Questions about timber shopfronts in New Romney
How much disruption will a timber front cause in my New Romney shop?
Expect more time on site than an aluminium front, typically 3 to 7 days with the painting. Closed-day or out-of-hours fitting can be arranged, and the opening stays boarded and secure between stages.
Do you make the joinery for New Romney shops to order?
Yes. Every length is made to the signed-off drawings for your opening, then brought to New Romney from Great Barr by vetted teams working under S&K Glazing.
What should I budget for looking after a timber front in New Romney?
A repaint every 5 to 7 years, plus a yearly wash and touch-up of the cills. Door gear needs checking too, since seasonal movement can throw a door out of line.
Does the Equality Act apply to a shop entrance in the New Romney area?
Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.
Do I need planning permission to change a shopfront in the New Romney area?
Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.