0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Bi-folding shopfronts
  4. Mayfair

Bi-folding shopfronts in Mayfair

A frontage for Mayfair premises, drawn first and ordered later.

If your Mayfair unit has a wide opening and a front that stays shut all year, folding panels could change how you use it. Sets are typically ready 4 to 7 weeks after sign-off, with 2 to 4 days on site arranged around your trading.

A survey in Mayfair usually starts outside, looking at the whole elevation before any tape comes out, because the frontage has to answer the building above it.

Restaurant bi-folding shopfront with slim aluminium glazed panels stacked open to the pavement

What should you think about before commissioning bi-folding shopfronts in Mayfair?

Bi-folds suit a two-stage fit at Mayfair premises that trade late. We'd take the old front out and fix the frame during closed hours, then hang and adjust the panels the following night, with temporary boarding in between.

On a narrow Mayfair unit, the stack can swallow the opening. We'd limit the set to three panels, or look at a single sliding leaf, so the opening you gain outweighs the width lost to parked frames.

A corner unit has two fronts to think about, and the return elevation often does as much selling as the main one. If that is your layout in Mayfair, carry the fascia and glass line round the corner and treat both faces as one composition.

What is a realistic budget for bi-folding shopfronts in Mayfair?

Allow £5,195 to £13,995 plus VAT for a typical opening. Size and specification set most of that figure for bi-folding shopfronts, and the rest depends on what the survey finds on site.

Who approves bi-folding shopfronts in Mayfair?

For bi-folding shopfronts at premises in the Mayfair area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.

For Mayfair, the usual route for planning and advert applications is through Westminster City Council, and we confirm that when we visit.

Mayfair at a glance
TownMayfair
AreaGreater London
Postcode districtsW1
Planning authorityWestminster City Council
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 104 miles
SurveyFree for new work

Does Westminster City Council publish shopfront guidance?

Yes, Shopfronts, Blinds and Signs - A Guide to their Design (1993). It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:

  • Roller shutters will not normally be given consent, and internally fitted brick-bond grilles are the preferred solution.
  • Large internally lit box signs are generally inappropriate, while externally lit fascias and back-lit or halo-lit letters are accepted.
  • Projecting signs need at least 2.6m clearance above the pavement and should sit at fascia level, centred on a pilaster.

Read our summary of the Westminster guidance

Questions about bi-folding shopfronts in Mayfair

Can the threshold be level at my Mayfair premises?

It can be close to level, depending on the floor and drainage. We'd check the levels at survey, because a track sitting flush with the pavement still needs somewhere for water to go.

Will I lose a table to the stack in my Mayfair restaurant?

Possibly one, but careful layout usually avoids it. We draw the folded panels on your floor plan, then look at moving the stack to a quieter corner or splitting the set in two.

Who do I speak to about a bi-fold in Mayfair?

Your named contact stays the same from the first visit to the final adjustment. Fitting is carried out by vetted teams working under S&K Glazing, travelling from Great Barr.

What rules apply to a fire exit door through a shopfront in the Mayfair area?

It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.

Do I need listed building consent for a shopfront in the Mayfair area?

Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.

Planning bi-folding shopfronts in Mayfair?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price