Restaurants, salons and boutiques each ask something different of a frontage. We design around how people will use your Kew premises, from the door to the display.
Please have keys to any meter cupboards and shutter housings to hand when we survey in Kew, because what sits behind them can change the drawing.

What should you think about before commissioning shopfront design in Kew?
Should several trades be involved in your fit-out, we coordinate the frontage with the shopfitter's drawings. Ceiling lines, display depths and shutter boxes then agree with each other before work starts.
For a corner unit in Kew, we design both elevations as one. The return, the door position and the sign all depend on which street brings your customers.
If your premises were once two shops, decide early whether the front should read as one or as two. One continuous fascia with a repeated bay width usually settles the elevation better than two mismatched halves, which is worth testing on any Kew unit of that kind.
What is a realistic budget for shopfront design in Kew?
A sensible starting budget is £495 to £2,495 plus VAT per frontage. What shifts the figure is whatever can't be seen yet, such as the condition behind the old frontage or the services running through it.
Who approves shopfront design in Kew?
A true like-for-like replacement usually needs no planning permission in England, because the external appearance isn't materially affected. New materials, a different glass line or altered proportions usually do count as material, so for shopfront work at premises in the Kew area, an application is then likely. The council confirms which side of that line a job falls on.
For Kew, the usual route for planning and advert applications is through London Borough of Richmond upon Thames, and we confirm that when we visit.
| Town | Kew |
|---|---|
| Area | Greater London |
| Postcode districts | SW14, TW8, TW9, W4 |
| Planning authority | London Borough of Richmond upon Thames |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 101 miles |
| Survey | Free for new work |
Does London Borough of Richmond upon Thames publish shopfront guidance?
Yes, Shopfronts: Supplementary Planning Document (2010). It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:
- The fascia should be no deeper than the cornice and architrave combined, and no more than one-fifth of total shopfront height.
- External roller shutters are unlikely to be permitted, and internal grilles are the only acceptable security form in conservation areas and on listed buildings.
- Internally lit box fascia signs will usually be resisted, with externally lit fascias generally preferred.
Questions about shopfront design in Kew
How many options will I see for my Kew premises?
Usually two or three directions at concept stage, then one developed design. If you already know what you want, we can go straight to the developed drawings.
Can a design for Kew premises follow my brand guidelines?
Yes. Send them over with your logo files, and we apply them to your elevation. Where a rule does not fit the building, we explain why and suggest an adjustment.
Can you design a frontage for Kew premises I have not taken on yet?
Yes. A survey and concept drawing can show what the unit could become and what it might cost. That can be useful before you sign anything.
Does a new shopfront in the Kew area need Building Regulations approval?
Assume yes until building control says otherwise. England has no like-for-like exemption, though registered installers can self-certify replacement windows and doors in non-dwellings. That route doesn't cover structural glass, curtain walling or revolving doors.
Do I need listed building consent for a shopfront in the Kew area?
Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.