Restaurants, salons and boutiques each ask something different of a frontage. We design around how people will use your West End premises, from the door to the display.
We measure your West End opening in person, at a time agreed with you first, so the visit fits around your trading.

How would we approach shopfront design for your West End premises?
Should several trades be involved in your fit-out, we coordinate the frontage with the shopfitter's drawings. Ceiling lines, display depths and shutter boxes then agree with each other before work starts.
If your West End unit sits in a terrace, we draw the neighbouring frontages on the elevation too. Your design then has to work in context, which is how people will actually see it.
If there are storeys above the shop, the frontage should feel like the base of the building and not a sign stuck on it. Lining up mullions with the windows overhead is a small move that settles the whole elevation at West End premises.
What consents could affect shopfront design in West End?
A true like-for-like replacement usually needs no planning permission in England, because the external appearance isn't materially affected. New materials, a different glass line or altered proportions usually do count as material, so for shopfront work at premises in the West End area, an application is then likely. The council confirms which side of that line a job falls on.
Expect planning and advert applications here to go to Westminster City Council in the normal way. We check what that means for your building when we survey it in West End.
What should you budget for shopfront design in West End?
Allow £495 to £2,495 plus VAT per frontage. Size and specification set most of that figure for shopfront design, and the rest depends on what the survey finds on site.
| Town | West End |
|---|---|
| Area | Greater London |
| Postcode districts | W1C, W1H, W1K, W1U |
| Planning authority | Westminster City Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 103 miles |
| Survey | Free for new work |
Does Westminster City Council publish shopfront guidance?
Yes, Shopfronts, Blinds and Signs - A Guide to their Design (1993). It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:
- Roller shutters will not normally be given consent, and internally fitted brick-bond grilles are the preferred solution.
- Large internally lit box signs are generally inappropriate, while externally lit fascias and back-lit or halo-lit letters are accepted.
- Projecting signs need at least 2.6m clearance above the pavement and should sit at fascia level, centred on a pilaster.
Questions about shopfront design in West End
Do I need a design service for a simple West End shopfront?
Not always. Every job gets a measured survey and scale drawings anyway. The design service adds options, visuals and a full specification, which pay off when the look matters most.
How many options will I see for my West End premises?
Usually two or three directions at concept stage, then one developed design. If you already know what you want, we can go straight to the developed drawings.
What do you need from me before designing for my West End premises?
The address, brand files and a few frontages you admire are a good start. Tell us your rough budget too, because it helps us focus on what can be built.
Does the Equality Act apply to a shop entrance in the West End area?
Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.
Do I need listed building consent for a shopfront in the West End area?
Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.