Does your Bow shop need a hands-free entrance? A well-set sliding door gives customers, pushchairs and wheelchairs a clear way in, without anything swinging into the street.
Measuring the opening is the easy part of a survey in Bow. We also look at the beam above, the pavement fall and any meters or drains nearby.

Where should you begin with automatic sliding doors in Bow?
A corner unit in Bow can often move its entrance to the angle, where two directions of footfall meet. We'd look at a curved or canted door set, and check the wind on both streets before fixing the position.
On a narrow Bow frontage, parked leaves can leave too little opening. We'd look at a telescopic or single-slide set, and consider moving the door to one side to free up the display.
If there are storeys above the shop, the frontage should feel like the base of the building and not a sign stuck on it. Lining up mullions with the windows overhead is a small move that settles the whole elevation at Bow premises.
What sign-off might you need for automatic sliding doors in Bow?
England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for automatic sliding doors at premises in the Bow area: a planning application, or work that doesn't materially affect the external appearance.
At survey we check how things stand for your building, although applications for planning permission or advertisement consent here normally go to London Borough of Tower Hamlets.
What price should you expect for automatic sliding doors in Bow?
Until the survey is done, plan on £3,895 to £11,995 plus VAT per entrance. Unusual sizes, fine detail and phased working push the figure up, while a simple brief and clear access keep it toward the lower end.
| Town | Bow |
|---|---|
| Area | Greater London |
| Postcode districts | E14, E15, E3, E9 |
| Planning authority | London Borough of Tower Hamlets |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 107 miles |
| Survey | Free for new work |
Does London Borough of Tower Hamlets publish shopfront guidance?
Yes, Shopfronts and Roller Shutter Grilles. It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:
- Stallrisers are always required on traditional shopfronts.
- Fascias should normally be no more than 500mm deep and no higher than ground floor level.
- External roller shutter boxes will not be permitted, and shutters should wherever possible be an integral feature of the shopfront.
Questions about automatic sliding doors in Bow
What do I need to arrange for a door in Bow?
Usually just a power supply near the head, and we'll tell you exactly what at survey. We can bring that into the one contract if you'd rather not chase an electrician.
What will people on the street see at my Bow entrance?
Ideally, very little. The drive sits behind the fascia, the leaves line up with the screens beside them, and the frame colour matches the rest of your front.
Can an automatic door work with my Bow shop's alarm and locks?
Yes. The door can lock at closing, and it can link to your alarm or access control where the systems allow, with a manual key position as a fallback.
Do I need listed building consent for a shopfront in the Bow area?
Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.
Does the Equality Act apply to a shop entrance in the Bow area?
Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.