0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Curtain walling
  4. King's Cross

Curtain walling in King's Cross

Measured at your King's Cross premises, never guessed from a photograph.

Curtain walling gives King's Cross premises a glazed elevation that runs past the floor edges, where a standard shopfront frame would run out of span. We measure the structure first, then set the grid out to suit the building.

A survey in King's Cross usually starts outside, looking at the whole elevation before any tape comes out, because the frontage has to answer the building above it.

Aluminium curtain walling with slim mullions across a two-storey commercial facade at dusk

How would we approach curtain walling for your King's Cross premises?

If your King's Cross premises have a concrete frame, we open up a sample of slab edges at survey and plan brackets around what is really there. Steel frames and older masonry piers each need a different fixing, so nothing is priced from assumptions.

If the ground floor of your King's Cross premises is a shop, we carry the curtain wall grid down into the shopfront below. Door heads, fascia line and transoms then line up by design.

Where a fascia has crept down over the years, lifting it back to its original line can add real height to the glass. Check what sits behind it first at King's Cross premises, since a shutter box or old beam may set the limit.

What should you budget for curtain walling in King's Cross?

As a working budget, use £550 to £1,250 plus VAT per m². Your place inside that range for curtain walling depends mostly on how much of the existing frontage can stay and how much has to be put right first.

What consents could affect curtain walling in King's Cross?

For curtain walling at premises in the King's Cross area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.

For King's Cross, the usual route for planning and advert applications is through London Borough of Camden, and we confirm that when we visit.

King's Cross at a glance
TownKing's Cross
AreaGreater London
Postcode districtsN1C
Planning authorityLondon Borough of Camden
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 104 miles
SurveyFree for new work

Does London Borough of Camden publish shopfront guidance?

Yes, Camden Planning Guidance: Design (Chapter 6: Shopfronts) (2021). It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:

  • Existing stall risers should be kept, and new ones should be at least 300mm high or reach the top of the pilaster base or door panel.
  • Solid shutters are only acceptable in exceptional circumstances, and internal security measures are strongly encouraged.
  • Uncoated shutters, galvanised steel, milled finishes and anodised aluminium are not acceptable finishes.

Read our summary of the Camden guidance

Questions about curtain walling in King's Cross

Can you replace failing curtain walling on premises in King's Cross?

Yes. We survey the frame, brackets and seals first, because some elevations only need new glass and gaskets. If the frame itself has failed, we draw a replacement that can be phased around the building's use.

Can you match the frames already on my King's Cross building?

Usually, yes. Colour can be matched to a RAL reference or a sample, and cap profiles can be chosen to sit close to what is there. An exact match on an old system may not be possible, in which case we would suggest a deliberate change at a natural break.

Can part of an elevation in King's Cross be done first?

Yes, provided the break falls at a sensible mullion. Phasing can spread cost and disruption, although two visits usually cost more than one. We would draw the whole elevation first so the second phase matches.

What rules apply to a fire exit door through a shopfront in the King's Cross area?

It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.

Do I need planning permission to change a shopfront in the King's Cross area?

Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.

Planning curtain walling in King's Cross?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price