0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Timber shopfronts
  4. March

Timber shopfronts in March

Scale drawings for timber shopfronts in March before anything is made.

Looking for a front with more character on your March premises? A painted timber frontage, built up in layers and proportioned to the building, has a warmth that reads from across the street.

Surveys for March are booked with you directly. Tell us your quieter days and we'll work around them.

Painted timber shopfront with a moulded cornice, panelled stallriser and glazed double doors

How do you design around the building when planning timber shopfronts in March?

Where a landlord in March has set rules for materials or colour, timber is usually an easy conversation. We'd prepare a drawing and paint reference for approval, and adjust the mouldings if the terms ask for something plainer.

In a parade of mixed fronts in March, painted timber can lift a unit without shouting. We'd take the height of the neighbouring cills and fascias, then let the depth of the mouldings and a considered colour do the talking.

If your March unit sits in a Victorian parade, the old pilasters usually set the rhythm, so a new front should land on them and not run past them. Keep that line and even a modern frame looks as though it belongs.

What might timber shopfronts cost in March?

The guide for timber shopfronts is £3,995 to £13,995 plus VAT for a typical frontage. Expect the lower end for simple work with clear access, and the upper end where detail, finish or awkward conditions add hours.

What permissions should you check for timber shopfronts in March?

England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for timber shopfronts at premises in the March area: a planning application, or work that doesn't materially affect the external appearance.

March applications for planning permission or advertisement consent are normally handled by Fenland District Council. Our survey includes a check of the position for your address.

March at a glance
TownMarch
AreaCambridgeshire
Postcode districtsPE15
Planning authorityFenland District Council
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 84 miles
SurveyFree for new work

Questions about timber shopfronts in March

Can a timber front take a modern sign in March?

Yes. Hand-painted letters suit a timber fascia well, and raised letters or a concealed trough light work too. We draw the sign and the joinery together, so the fixings don't cut through a moulding.

How much disruption will a timber front cause in my March shop?

Expect more time on site than an aluminium front, typically 3 to 7 days with the painting. Closed-day or out-of-hours fitting can be arranged, and the opening stays boarded and secure between stages.

Can you fit a timber front around existing tiles in March?

Often, yes, and it's usually worth trying. If your stallriser or entrance has good original tile, we'd measure it carefully and scribe the new joinery to it.

Do I need listed building consent for a shopfront in the March area?

Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.

Does the Equality Act apply to a shop entrance in the March area?

Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.

Planning timber shopfronts in March?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price