0800 088 6248 Get a guide price
  1. Home
  2. Areas
  3. Cambridgeshire
  4. March

Shopfronts in March

For March businesses that care how the front of the building reads from the street.

Retailers, restaurateurs, hoteliers and landlords in March can commission a complete frontage under one contract, with one named contact for the job.

Bring whatever you have to the survey in March: brand guidelines, lease plans, old drawings or a photo of a frontage you admire.

A bespoke shopfront of the kind we design for March

What can a new frontage include at March premises?

Where the goal is as little frame as possible, we fit frameless glass fronts that keep the view into your March premises clear. Toughened glass and slim patch fittings do the work, and the door hardware becomes the main detail.

Security needn't turn your March frontage into a blank wall after hours. Perforated roller shutters let light and the display show through, and we plan the box to sit behind the fascia where the building allows.

Where units share one long run of fascia, breaking the height makes you stand out for the wrong reason. If that describes your March parade, keep the line and win attention with lettering, lighting and what's in the window.

What consents will shopfronts in March need?

Security grilles and shutters are named in England's rules: installing or replacing one on a shopfront sits outside the shop permitted development rights. The frontage itself is treated the same way, so for shopfront work at premises in the March area, building work that materially affects the appearance needs planning permission. Confirm the position with the council before anything is ordered.

Class 4B, England's class for lit signs, isn't available in conservation areas, Areas of Outstanding Natural Beauty, National Parks or the Broads, so a lit sign there normally needs advertisement consent. In an area of special control it is unavailable too, and Class 5 drops to a 3.6m top height, 0.3m letters and one-tenth of the building face up to 3.6m. Ask the council which designations cover premises in the March area.

At survey we check how things stand for your building, although applications for planning permission or advertisement consent here normally go to Fenland District Council.

March at a glance
TownMarch
AreaCambridgeshire
Postcode districtsPE15
Planning authorityFenland District Council
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 84 miles
SurveyFree for new work

What can we fit in March?

Questions about shopfronts in March

Where do planning applications for March premises go?

They normally go to Fenland District Council, and advert applications usually follow the same route. We check the position for your address at survey, and our planning and consents service can prepare the application for you.

What do I receive after a survey at March premises?

You receive one itemised written quotation, valid for 90 days. Scale drawings and sign-off of the dimensions come before anything is made, and nothing is ordered until you accept.

Can you work around opening hours at March premises?

Yes. Tell us your quietest days and we'll plan around them, with closed-day or out-of-hours installation available by arrangement.

What rules apply to a fire exit door through a shopfront in the March area?

It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.

Does a shop sign in the March area need advertisement consent?

Not always. In England, an unlit sign within Class 5 of the 2007 Advertisement Regulations generally needs no application, and neither does a lit sign within Class 4B. Anything outside those classes needs consent, and Class 4B isn't available in conservation areas, so check before ordering.

Got premises in March?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price