0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Fascia signage
  4. March

Fascia signage in March

Scale drawings for fascia signage in March before anything is made.

Your name over the door is the first thing anyone reads, often from across the road. For shopfronts in March we size the lettering for that distance and keep a proper margin around it.

Measuring the opening is the easy part of a survey in March. We also look at the beam above, the pavement fall and any meters or drains nearby.

Deep green shop fascia with built-up metal letters above a glazed entrance

Where should you begin with fascia signage in March?

On a corner plot, the sign has to turn the corner cleanly. We set letter size and panel joints so the name reads from both streets, with the return falling at a natural break.

If the wall above your March shop is brick or stone, letters fixed straight to it may look better than a panel. We check the surface first, since soft brick needs a different fixing from hard stone.

If the pavement falls across your frontage, let the stallriser take up the slope and keep the glass line dead level. The eye reads the long horizontal, so March premises on a slope look settled once that line is true.

What sign-off might you need for fascia signage in March?

England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for fascia signage at premises in the March area: a planning application, or work that doesn't materially affect the external appearance.

Class 4B, England's class for lit signs, isn't available in conservation areas, Areas of Outstanding Natural Beauty, National Parks or the Broads, so a lit sign there normally needs advertisement consent. In an area of special control it is unavailable too, and Class 5 drops to a 3.6m top height, 0.3m letters and one-tenth of the building face up to 3.6m. Ask the council which designations cover premises in the March area.

March applications for planning permission or advertisement consent are normally handled by Fenland District Council. Our survey includes a check of the position for your address.

What price should you expect for fascia signage in March?

Our guide band is £395 to £1,995 plus VAT per sign. Scope is the biggest lever, so a tighter brief for fascia signage brings the figure down faster than any change of detail.

March at a glance
TownMarch
AreaCambridgeshire
Postcode districtsPE15
Planning authorityFenland District Council
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 84 miles
SurveyFree for new work

Questions about fascia signage in March

Can a fascia sign in March be lit later on?

Yes, if the sign is planned for it. Built-up letters can take halo lighting when the panel and cable route are prepared at the start, which costs far less than adapting them afterwards.

Can a sign match my other sites in Cambridgeshire?

Yes. Send a photograph and the drawings or brand file from an existing site, and we match the letter style, finish and colour reference. Fascia depth may differ, so the size is adjusted to keep the proportions right.

Can a new fascia sign in March be fitted on a closed day?

Yes, we can arrange that, or fit out of hours if that suits you better. Most fascia signs take about a day, so the work can often go into your quietest trading hours.

Do roller shutters need planning permission in the March area?

Usually yes. Installing or replacing a security grill or shutter on a shopfront is expressly outside England's shop permitted development rights, so the only way to avoid an application is work that doesn't materially affect the appearance. Ask the council before ordering.

Does the Equality Act apply to a shop entrance in the March area?

Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.

Planning fascia signage in March?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price