Landlords, shopfitters and architects working in March can use the service as a full package or for one difficult detail. Either way the drawings start from a measured survey.
Nothing gets ordered off the back of a survey in March, because its job is to give us the numbers to draw and price from.

How do you design around the building when planning shopfront design in March?
Should several trades be involved in your fit-out, we coordinate the frontage with the shopfitter's drawings. Ceiling lines, display depths and shutter boxes then agree with each other before work starts.
If your March unit sits in a terrace, we draw the neighbouring frontages on the elevation too. Your design then has to work in context, which is how people will actually see it.
If you trade after dark in March, the view in matters more than the sign. A warm, evenly lit interior with light on the back wall will usually do more than a brighter fascia, because it gives the eye somewhere to go.
What permissions should you check for shopfront design in March?
England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for shopfront work at premises in the March area: a planning application, or work that doesn't materially affect the external appearance.
At survey we check how things stand for your building, although applications for planning permission or advertisement consent here normally go to Fenland District Council.
What might shopfront design cost in March?
The guide for shopfront design is £495 to £2,495 plus VAT per frontage. Expect the lower end for simple work with clear access, and the upper end where detail, finish or awkward conditions add hours.
| Town | March |
|---|---|
| Area | Cambridgeshire |
| Postcode districts | PE15 |
| Planning authority | Fenland District Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 84 miles |
| Survey | Free for new work |
Questions about shopfront design in March
Can you design a frontage for March premises I have not taken on yet?
Yes. A survey and concept drawing can show what the unit could become and what it might cost. That can be useful before you sign anything.
What do you need from me before designing for my March premises?
The address, brand files and a few frontages you admire are a good start. Tell us your rough budget too, because it helps us focus on what can be built.
How many options will I see for my March premises?
Usually two or three directions at concept stage, then one developed design. If you already know what you want, we can go straight to the developed drawings.
Do roller shutters need planning permission in the March area?
Usually yes. Installing or replacing a security grill or shutter on a shopfront is expressly outside England's shop permitted development rights, so the only way to avoid an application is work that doesn't materially affect the appearance. Ask the council before ordering.
Does a shop sign in the March area need advertisement consent?
Not always. In England, an unlit sign within Class 5 of the 2007 Advertisement Regulations generally needs no application, and neither does a lit sign within Class 4B. Anything outside those classes needs consent, and Class 4B isn't available in conservation areas, so check before ordering.