0800 088 6248 Get a guide price
  1. Home
  2. Services
  3. Curtain walling
  4. March

Curtain walling in March

Measured at your March premises, never guessed from a photograph.

Curtain walling gives March premises a glazed elevation that runs past the floor edges, where a standard shopfront frame would run out of span. We measure the structure first, then set the grid out to suit the building.

We measure your March opening in person, at a time agreed with you first, so the visit fits around your trading.

Aluminium curtain walling with slim mullions across a two-storey commercial facade at dusk

What goes into getting curtain walling right in March?

Unloading is worth thinking through early on any March site with restricted access. Mullions can run to 6m or more, so we look at lifting routes, storage and where a delivery can stop.

Where your frontage in March faces open ground, wind load can push mullions a size deeper than a sheltered terrace would need. We check exposure for your elevation, so the sections are no heavier than they have to be.

Where the footway outside your March premises is narrow, a recessed entrance earns its keep. It gives people a dry place to pause out of the walkway, and it adds a longer run of display glass either side of the door.

How much could curtain walling in March cost you?

Allow £550 to £1,250 plus VAT per m². Size and specification set most of that figure for curtain walling, and the rest depends on what the survey finds on site.

Which applications might curtain walling in March involve?

For curtain walling at premises in the March area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.

Planning and advert applications for March premises normally go to Fenland District Council. We check the position for your address at survey.

March at a glance
TownMarch
AreaCambridgeshire
Postcode districtsPE15
Planning authorityFenland District Council
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 84 miles
SurveyFree for new work

Questions about curtain walling in March

What should I send before a survey of my March premises?

The address, a few photographs and any existing drawings are enough to start. Tell us how the building is used and which floors stay occupied, because that shapes the access plan.

Can you match the frames already on my March building?

Usually, yes. Colour can be matched to a RAL reference or a sample, and cap profiles can be chosen to sit close to what is there. An exact match on an old system may not be possible, in which case we would suggest a deliberate change at a natural break.

Will you coordinate with my architect or main contractor in March?

Yes. We can work to their drawings and programme, and we supply shop drawings for their review before anything is made. Your named contact stays the single route for questions on our package.

Does a shop sign in the March area need advertisement consent?

Not always. In England, an unlit sign within Class 5 of the 2007 Advertisement Regulations generally needs no application, and neither does a lit sign within Class 4B. Anything outside those classes needs consent, and Class 4B isn't available in conservation areas, so check before ordering.

Do I need listed building consent for a shopfront in the March area?

Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.

Planning curtain walling in March?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price