Many tired frontages are closer to good than they look. On March premises a new sign, fresh colour and better glass can do most of the work of a full replacement.
Nothing gets ordered off the back of a survey in March, because its job is to give us the numbers to draw and price from.

How do you design around the building when planning shopfront refurbishment in March?
If the glass is old, we look for the etched safety mark in the corner of each pane. Panes without one, in the door or at low level, should be replaced while the frontage is being worked on.
If later panels cover the original fascia, we lift a corner at survey. Surviving cornices, pilasters or tile can change the whole plan, and they cost nothing to keep.
Where units share one long run of fascia, breaking the height makes you stand out for the wrong reason. If that describes your March parade, keep the line and win attention with lettering, lighting and what's in the window.
What might shopfront refurbishment cost in March?
Until the survey is done, plan on £1,995 to £8,995 plus VAT depending on what is kept. Unusual sizes, fine detail and phased working push the figure up, while a simple brief and clear access keep it toward the lower end.
What permissions should you check for shopfront refurbishment in March?
England has no permitted development route for changing a shopfront. Part 7 Class A of the General Permitted Development Order 2015 excludes creating, altering or replacing one, and it allows no alterations at all on article 2(3) land. That leaves two outcomes for shopfront refurbishment at premises in the March area: a planning application, or work that doesn't materially affect the external appearance.
At survey we check how things stand for your building, although applications for planning permission or advertisement consent here normally go to Fenland District Council.
| Town | March |
|---|---|
| Area | Cambridgeshire |
| Postcode districts | PE15 |
| Planning authority | Fenland District Council |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 84 miles |
| Survey | Free for new work |
Questions about shopfront refurbishment in March
Can my March shopfront be refurbished without closing?
Usually, yes. Work is split into stages around your trading hours, and closed-day or out-of-hours work can be arranged for anything that affects the door.
How do I know if my March shopfront needs replacing?
A measured survey will show you. We check the frame, joints, door and glass, then tell you plainly whether refurbishment will last or whether a new shopfront would be better value.
What if you find more damage on my March premises?
We stop, photograph it and show you the cost before going further. Nothing extra goes ahead without your agreement.
Do I need listed building consent for a shopfront in the March area?
Usually yes, if the building is listed. In England the local planning authority decides, and Historic England is notified of Grade I and II* works and specified Grade II works. Like-for-like repair may not need consent, so ask the council before work starts.
Do I need planning permission to change a shopfront in the March area?
Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.