0800 088 6248 Get a guide price
  1. Home
  2. Areas
  3. Greater London
  4. Crystal Palace

Shopfronts in Crystal Palace

Aluminium, glass, timber and heritage fronts for Crystal Palace and the rest of Greater London.

Retailers, restaurateurs, hoteliers and landlords in Crystal Palace can commission a complete frontage under one contract, with one named contact for the job.

Please have keys to any meter cupboards and shutter housings to hand when we survey in Crystal Palace, because what sits behind them can change the drawing.

A bespoke shopfront of the kind we design for Crystal Palace

What can a new frontage include at Crystal Palace premises?

Not every Crystal Palace frontage needs replacing. Refurbishment can mean new glass, a fresh coating, a rebuilt stallriser or a new fascia on a frame that is still sound, which keeps money back for the parts people notice.

For Crystal Palace premises that want slim lines in almost any colour, we fit powder-coated aluminium shopfronts drawn to the opening. They suit long frontages and modern units well, with glazing bars placed to answer the building above.

If your premises were once two shops, decide early whether the front should read as one or as two. One continuous fascia with a repeated bay width usually settles the elevation better than two mismatched halves, which is worth testing on any Crystal Palace unit of that kind.

What consents will shopfronts in Crystal Palace need?

A true like-for-like replacement usually needs no planning permission in England, because the external appearance isn't materially affected. New materials, a different glass line or altered proportions usually do count as material, so for shopfront work at premises in the Crystal Palace area, an application is then likely. The council confirms which side of that line a job falls on.

A lit projecting sign at premises in the Crystal Palace area has firm limits under Class 4B in England: 0.75m² per surface and 1m high. It can project 1m, or two-thirds of the footway if that is less, and it can't sit over the carriageway. A larger sign needs advertisement consent, and so does a lit one in a conservation area.

Expect planning and advert applications here to go to London Borough of Bromley in the normal way. We check what that means for your building when we survey it in Crystal Palace.

Crystal Palace at a glance
TownCrystal Palace
AreaGreater London
Postcode districtsSE19, SE20, SE26, SE27
Planning authorityLondon Borough of Bromley
Building approvalBuilding Regulations (Approved Documents)
Distance from Great BarrAbout 110 miles
SurveyFree for new work

What can we fit in Crystal Palace?

Questions about shopfronts in Crystal Palace

Where do you travel from for Crystal Palace jobs?

We travel from Great Barr, Birmingham. Surveys start from there, and the work itself is carried out by vetted teams working under S&K Glazing, the same arrangement we use across Greater London.

What do I receive after a survey at Crystal Palace premises?

You receive one itemised written quotation, valid for 90 days. Scale drawings and sign-off of the dimensions come before anything is made, and nothing is ordered until you accept.

Can you keep our existing shutter or sign at Crystal Palace premises?

Often, yes, if it is sound and suits the new design. We check the condition and the fixings at survey, and the quotation shows clearly what stays and what goes.

What rules apply to a fire exit door through a shopfront in the Crystal Palace area?

It must open in the direction of escape and can't be locked against immediate use, and a dedicated fire exit can't be a sliding or revolving door. In England that comes from article 14(2) of the Regulatory Reform (Fire Safety) Order 2005, and the duty sits with the responsible person, normally the employer or whoever controls the premises for a business, otherwise the owner. An outward door can clash with section 153 of the Highways Act 1980 where it opens onto the footway, so raise it early.

Does the Equality Act apply to a shop entrance in the Crystal Palace area?

Yes. The Equality Act 2010 applies in England, as across Great Britain, and it requires reasonable steps to remove, alter or avoid physical features that disadvantage disabled people. The duty is anticipatory, so it looks at disabled people generally, and a new Services Code replaced the 2011 Code on 5 August 2026.

Got premises in Crystal Palace?

Send the address and a photo, and we'll come and measure it.

Call usGet a guide price