We design, make and fit bespoke shopfronts for Wembley premises and the rest of Greater London. Every front is drawn to the measured opening, so nothing is adapted from a stock size.
Expect us to measure the opening, photograph the existing front and check how materials will reach it on the day, at a time you have agreed.

What shopfront work can you have done in Wembley?
We fit automatic sliding doors for Wembley premises with steady footfall or customers who need a clear, easy way in. A slim track and a well-placed sensor stop the door opening every time someone walks past.
Security needn't turn your Wembley frontage into a blank wall after hours. Perforated roller shutters let light and the display show through, and we plan the box to sit behind the fascia where the building allows.
If you trade after dark in Wembley, the view in matters more than the sign. A warm, evenly lit interior with light on the back wall will usually do more than a brighter fascia, because it gives the eye somewhere to go.
What consents will shopfronts in Wembley need?
For shopfront work at premises in the Wembley area, the deciding question in England is whether the building work materially affects the external appearance. If it does, planning permission is needed, while a true like-for-like replacement usually needs none. The council confirms the position for each site.
In England, signs at premises in the Wembley area come under the 2007 Advertisement Regulations. An unlit fascia sign generally needs no application under Class 5 of Schedule 3 if it sits on a wall containing a shop window, tops out at 4.6m or the first-floor sill if that is lower, and keeps letters to 0.75m high. Displaying a sign without the consent it needs is a criminal offence, so check before it goes up.
For Wembley, the usual route for planning and advert applications is through London Borough of Brent, and we confirm that when we visit.
| Town | Wembley |
|---|---|
| Area | Greater London |
| Postcode districts | HA0, HA9, NW10, UB6 |
| Planning authority | London Borough of Brent |
| Building approval | Building Regulations (Approved Documents) |
| Distance from Great Barr | About 97 miles |
| Survey | Free for new work |
Does Brent Council publish shopfront guidance?
Yes, Shopfronts SPD3 (2018). It tells applicants what the council expects from new and altered shopfronts. A few of the things it asks for:
- A stallriser of at least 300mm should be kept or installed at the base of the shop display.
- Fascia text should cover no more than half the fascia's width and height, with lettering no taller than 30cm.
- Solid or pin-hole roller shutters are discouraged, and security options run from laminated glass to internal open shutters, then external open shutters only where needed for insurance.
What can we fit in Wembley?
- Aluminium shopfronts
from £2,495 plus VAT - Frameless glass shopfronts
from £4,995 plus VAT - Timber shopfronts
from £3,995 plus VAT - Bi-folding shopfronts
from £5,195 plus VAT - Heritage shopfronts
from £8,495 plus VAT - Bronze and metal shopfronts
from £7,995 plus VAT - Curved glass shopfronts
from £6,995 plus VAT - Automatic sliding doors
from £3,895 plus VAT - Frameless glass doors
from £1,495 plus VAT - Revolving doors
from £19,995 plus VAT - Accessible entrances
from £995 plus VAT - Curtain walling
from £550 plus VAT per m² - Structural glazing
from £950 plus VAT per m² - Stallrisers and cladding
from £195 plus VAT per m² - Fascia signage
from £395 plus VAT - Illuminated signage
from £895 plus VAT - Projecting signs
from £395 plus VAT - Canopies and awnings
from £1,495 plus VAT - Perforated roller shutters
from £1,695 plus VAT - Security glazing
from £195 plus VAT per m² - Shopfront design service
from £495 plus VAT - Planning and consents
from £395 plus VAT - Multi-site rollouts
Priced per estate - Shopfront refurbishment
from £1,995 plus VAT
Questions about shopfronts in Wembley
What do you look at during a survey in Wembley?
The opening comes first: widths, heights, levels and diagonals. After that we check the structure above, where services run, how materials will reach the front and what can be kept.
What do I receive after a survey at Wembley premises?
You receive one itemised written quotation, valid for 90 days. Scale drawings and sign-off of the dimensions come before anything is made, and nothing is ordered until you accept.
Can I get a price for Wembley premises before a survey?
Yes, as a guide. Our prices page and guide price tool give you a budget figure straight away, and the firm price follows in a written quotation once the opening has been measured.
Do I need planning permission to change a shopfront in the Wembley area?
Usually yes, if the work materially affects the building's external appearance. England's shop permitted development rights exclude creating, altering or replacing a shopfront, so there is no shortcut. A true like-for-like replacement usually needs no application, and the council confirms the position.
Does a new shopfront in the Wembley area need Building Regulations approval?
Assume yes until building control says otherwise. England has no like-for-like exemption, though registered installers can self-certify replacement windows and doors in non-dwellings. That route doesn't cover structural glass, curtain walling or revolving doors.